The RTS Link is a 4 km cross-border rail line between Bukit Chagar in Johor Bahru and Woodlands North in Singapore. The ride takes about five minutes, both countries' immigration is cleared at the departure station, and passenger service is expected to start in February 2027. Fares and hours had not been announced as of November 2026.
In this guide
- Key takeaways
- What is the RTS Link?
- When will the RTS Link open?
- What is the route and how long is the ride?
- What are the two RTS stations like?
- How will immigration work on the RTS Link?
- What happens to the KTM Shuttle Tebrau?
- Who benefits most from the RTS Link?
- Worked example: what changes for a daily commuter?
- Why does JB need the RTS Link?
- RTS Link checklist for future residents
- Conclusion
- Sources
The RTS Link JB–Singapore rail line is the single biggest transport change Johor Bahru has seen in a generation. In about five minutes, a driverless train will carry passengers between Bukit Chagar in JB and Woodlands North in Singapore, with immigration for both countries cleared at the departure station. This guide pulls together what has been officially confirmed as of early November 2026: the opening date, the route, travel time, the two stations, how clearance will work and what is still to be announced.
Key takeaways
- Passenger service is now expected to start in February 2027, per a joint Malaysia–Singapore statement on 2 October 2026.
- The line is about 4 km long and the ride takes about 5 minutes, linking Bukit Chagar (JB) and Woodlands North (Singapore).
- Each station has co-located CIQ: you clear both countries’ checks before boarding and walk straight out on arrival.
- Projected capacity is up to 10,000 passengers per hour per direction.
- Fares and official operating hours had not been announced as of early November 2026.
- Woodlands North is the northern end of Singapore’s Thomson–East Coast Line (TEL), so you can continue straight into the MRT network.
What is the RTS Link?
The Johor Bahru–Singapore Rapid Transit System Link (RTS Link) is a cross-border shuttle railway built under a bilateral agreement between Malaysia and Singapore. It is designed to move large numbers of daily commuters across the Straits of Johor without the road queues that have defined Causeway travel for decades.
The line is roughly 4 km of twin track: about 2.3 km on the Malaysian side and 1.7 km on the Singapore side. It runs on its own viaduct, separate from the road Causeway, so traffic jams on the bridge do not slow the train.
Who runs it?
The operator is RTS Operations Pte Ltd (RTSO), a joint venture between Malaysia’s Prasarana and Singapore’s SMRT Corporation, under a 30-year concession. The fleet consists of eight driverless four-car trains built by CRRC Zhuzhou, unveiled in June 2025. Each train is reported to carry around 600 passengers at normal load and up to about 1,087 at maximum load.
When will the RTS Link open?
On 2 October 2026, Singapore’s Land Transport Authority (LTA) and Malaysia’s Ministry of Transport said passenger service is now expected to begin in February 2027, instead of the earlier January target. The infrastructure in both countries is described as substantially complete. What remains is testing, commissioning and approvals.
- By 31 December 2026: RTSO aims to complete final system tests and trial runs, and the system is to be handed over to the operator.
- Next: an independent safety assessor must certify the system.
- Then: regulators in both countries (APAD in Malaysia and LTA in Singapore) review the certification and approve passenger operations.
- Finally: the exact opening day is announced jointly.
Malaysia’s Transport Minister Anthony Loke said on 8 October 2026 that the project was not delayed in substance; February was chosen to give a safety buffer for the final evaluation and technical approvals. The service reportedly aims to open before Hari Raya 2027.
What is the route and how long is the ride?
The route is a simple point-to-point shuttle with only two stations. There are no intermediate stops.
| Item | Detail (as reported, Oct–Nov 2026) |
|---|---|
| Malaysian terminus | Bukit Chagar station, Jalan Tun Abdul Razak, Johor Bahru |
| Singapore terminus | Woodlands North station (connects to TEL) |
| Length | About 4 km (≈2.3 km Malaysia, ≈1.7 km Singapore) |
| Ride time | About 5 minutes |
| Capacity | Up to 10,000 passengers per hour per direction |
| Expected daily ridership | About 40,000 at launch, rising over time (planning estimates) |
| Trains | 8 driverless 4-car trains |
| Opening | Expected February 2027 (subject to approvals) |
| Fares / hours | Not officially announced yet |
How does five minutes compare with today?
The five-minute figure is the time on the train. Your door-to-door journey will also include walking to the station, clearing immigration and, in Singapore, connecting to the MRT. Even so, the key difference is predictability: the train does not sit in Causeway traffic, and the checkpoint queue is inside a station designed for rail passengers rather than shared with cars and buses.
What are the two RTS stations like?
Bukit Chagar station (Johor Bahru)
Bukit Chagar station is an elevated station in the heart of JB city centre, next to the Bukit Chagar CIQ building. It sits within walking distance of JB Sentral, Johor Bahru City Square and KOMTAR JBCC. Public reference sources describe a walkway of roughly 400 m linking the station to JB Sentral, where you can catch KTM ETS, Komuter and intercity trains. In August 2026 the Malaysian government also approved an RM60 million bridge to give Komuter passengers a direct link to the RTS station, expected to take about 12 months to build.
The station uses a “Spanish solution” layout, with one platform for boarding and separate platforms for alighting, which helps keep arriving and departing crowds apart at peak hours. Details such as exits, taxi bays and pick-up points are still listed as “to be confirmed” by transport reference sites.
Woodlands North station (Singapore)
Woodlands North is the northern terminus of Singapore’s Thomson–East Coast Line (TEL). From there, the TEL runs south through Woodlands, Stevens, Orchard and on to Gardens by the Bay and the east coast. That means a commuter can transfer from the RTS to the MRT without leaving the station area and reach central Singapore on one line.
How will immigration work on the RTS Link?
This is the feature that makes the RTS different from every existing crossing. Each station has co-located customs, immigration and quarantine (CIQ) facilities for both countries.
- Going JB → Singapore: you clear Malaysian departure and Singapore arrival checks at Bukit Chagar, then board.
- Going Singapore → JB: you clear Singapore departure and Malaysian arrival at Woodlands North, then board.
- On arrival, you simply walk out; there is no second checkpoint queue.
Bring a passport with sufficient validity, and keep an eye on any announcements about QR code or biometric clearance for RTS passengers before launch. We cover what is known about fares, hours and clearance in more detail in our RTS fares, hours and immigration guide.
What happens to the KTM Shuttle Tebrau?
The KTM Shuttle Tebrau has run between JB Sentral and Woodlands Train Checkpoint since July 2015, with a one-way fare of RM5 from JB and S$5 from Woodlands. Under the bilateral agreement, it will stop six months after the RTS Link begins operations. In practice, both services should run side by side for roughly the first half of 2027, giving commuters time to switch.
Who benefits most from the RTS Link?
If you are a Singapore commuter
The RTS turns JB city centre into a realistic daily base. A predictable cross-border leg plus the TEL means a daily commute that no longer depends on Causeway traffic. For a full cost breakdown, read renting at Twin Tower as a Singapore commuter.
If you are an investor
Homes within walking distance of Bukit Chagar station are the most direct way to own the RTS story. Twin Tower Residence, a freehold serviced residence completed in 2023, sits beside the station. Portal asking rents in October 2026 were roughly RM3,000–3,500 a month for 2-bedroom (882 sq ft) units, and indicative gross yields work out at about 3.5%–4.5% based on asking rent and asking prices. See how the RTS Link is shaping prices around Bukit Chagar.
If you are a visitor or retiree
Weekend trips, medical appointments and family visits become easier to plan when the crossing takes minutes rather than an unpredictable hour on the road.
Worked example: what changes for a daily commuter?
Consider a commuter who crosses twice a day, 22 working days a month. That is 22 × 2 = 44 crossings a month. Even if the train itself saves only part of the queue time, a predictable 5-minute ride replaces a road journey whose length varies with traffic. Fares are not yet published, so we will not guess them; once they are announced, monthly cost is simply fare × 44. For example, if a one-way fare were F, monthly transport for the cross-border leg would be 44F, and you can compare that against bus fares (see our commute options comparison).
Why does JB need the RTS Link?
The Johor–Singapore Causeway, opened in the 1920s, is one of the busiest land crossings in the world. Commonly cited estimates put typical daily crossings at around 250,000 to 400,000 people across Singapore’s land checkpoints, and peak holiday days have gone well beyond that. Almost all of that traffic shares one road bridge and two road checkpoints, which is why a “short” 1 km crossing can take anywhere from minutes to hours.
The RTS adds a dedicated rail lane with its own checkpoints. At up to 10,000 passengers per hour in each direction, a single line can move a very large share of peak-hour commuters without adding a single car to the bridge. That shift is what planners, employers and property buyers are watching most closely in 2027.
What it means for the neighbourhood
- Foot traffic: tens of thousands of daily passengers arriving at Bukit Chagar support shops, food outlets and services nearby.
- Rental demand: people working in Singapore who want lower living costs can now consider a city-centre JB address seriously.
- Connectivity: the RTS links into JB Sentral, the bus terminal and the KTM network, turning the area into a true transport hub.
RTS Link checklist for future residents
- Confirm the official opening date and fares when announced (expected around the turn of the year).
- Choose a home within comfortable walking distance of Bukit Chagar station.
- Check your passport validity and any pre-registration for automated clearance.
- Plan your Singapore leg along the TEL from Woodlands North.
- Keep the Shuttle Tebrau and buses as back-ups during the first months.
If you would like to live or invest right next to the station, WhatsApp Darren for the latest available Twin Tower Residence units, floor plans and asking rents. You can also browse current listings or see the location map.
Conclusion
The RTS Link is in its final testing stage, with passenger service expected in February 2027. Its five-minute ride, co-located immigration and direct TEL connection make Bukit Chagar the new front door between JB and Singapore. For homeowners, tenants and investors, being a short walk from that door is the clearest advantage a JB address can offer in 2027.
Sources
- LTA – Grantors informed RTS Link service targeted for Feb 2027 (2 Oct 2026)
- Malay Mail – JB-Singapore RTS Link service start pushed back to February 2027 (2 Oct 2026)
- Malay Mail – Loke: RTS Link not delayed, buffer needed for safety approvals (8 Oct 2026)
- Bernama – Tebrau Shuttle to end six months after RTS starts (8 Oct 2026)
- Malay Mail – RM60m bridge to RTS station approved (18 Aug 2026)
- Wikipedia – Johor Bahru–Singapore Rapid Transit System
- Land Transport Guru – Bukit Chagar RTS Link Station
- Wikipedia – Johor–Singapore Causeway
Frequently asked questions
Is the RTS Link opening in January or February 2027?
February 2027. A joint statement by Singapore's LTA and Malaysia's Ministry of Transport on 2 October 2026 moved the expected start from January to February 2027. The exact day will be announced only after independent safety certification and approvals from APAD and LTA, so treat any specific date before that as unconfirmed.
Do I need to clear immigration twice on the RTS Link?
No. Each RTS station hosts both countries' customs, immigration and quarantine. You complete Malaysian and Singapore checks at the station where you board, then walk out freely at the other end. This is different from the road Causeway, where you clear Malaysia at the BSI complex and Singapore at Woodlands Checkpoint separately.
How much will the RTS Link cost?
Fares had not been officially announced as of early November 2026. Both governments have said fares and the opening date will be announced jointly closer to launch. Until then, budget using current options such as the Shuttle Tebrau (RM5 from JB, S$5 from Woodlands) and cross-border buses, and update your numbers once the official fare is published.
Which Singapore MRT line connects to the RTS Link?
The Thomson–East Coast Line (TEL). Woodlands North, the RTS Link's Singapore terminus, is the TEL's northern end. From there the line runs south through Woodlands, Stevens and Orchard towards Gardens by the Bay and the east, giving RTS passengers a single-line ride into central Singapore.
Will the KTM Shuttle Tebrau stop when the RTS opens?
Not immediately. Under the bilateral agreement, the Shuttle Tebrau between JB Sentral and Woodlands will be discontinued six months after RTS Link operations begin. So both services are expected to run in parallel for roughly the first half of 2027, which gives regular commuters a transition period.