Twin Tower Residence JB

Quick Answers

How Long Is the Commute From Twin Tower to Singapore?

By Darren Updated 2 min read

Traffic lanes at the busy Johor Bahru–Singapore border crossing

Quick answer

It depends on queues. Today you walk to the JB CIQ and take a bus across the Causeway, and peak waits can run to hours. Once the RTS Link opens, targeted for February 2027, the ride to Woodlands North takes about five minutes, with both immigration checks done at departure.

In this guide
  1. How long does the crossing take today?
  2. What changes when the RTS Link opens?
  3. How do I continue into Singapore?
  4. Related guides
  5. Sources

Today, the trip from Twin Tower Residence to Singapore is a short walk to the JB CIQ followed by a bus across the Causeway, and the total time depends mostly on checkpoint queues. Once the RTS Link opens next door, the crossing itself becomes a ride of about five minutes.

Leg Today (CIQ + bus) After the RTS Link opens
Home to departure point Walk to the JB CIQ (Bangunan Sultan Iskandar) Walk next door to Bukit Chagar station
Immigration Malaysia at the JB CIQ, then Singapore at Woodlands Both countries at the departure station (co-located)
Crossing Bus over the Causeway About 5 minutes over about 4 km
Frequency Depends on bus services Reported every 3.6 minutes at peak, about 6am to midnight
Opening Running now Targeted for February 2027

How long does the crossing take today?

There is no official door-to-door figure, because queues change by hour and by season. Recent official warnings give a sense of the peaks: ICA’s Deepavali 2026 advisory said motorists could wait up to three hours, and the land checkpoints set a daily record of more than 599,000 travellers on 4 September 2026 (reported 4 Nov 2026). The NST (30 Mar 2026) reported that commuters set aside 1.5–3 hours for crossings. Living within walking distance of the CIQ at least removes the drive to the checkpoint. Malaysia also trialled QR-code clearance (MyNIISe) for Singaporeans at the Causeway from 22 September 2025 to 28 February 2026; check its current status before you travel.

What changes when the RTS Link opens?

The LTA and Malaysia’s Ministry of Transport said on 2 October 2026 that passenger service is targeted for February 2027, subject to independent safety certification and final approvals. No exact day has been announced. According to the LTA project page, the line runs about 4 km between Bukit Chagar and Woodlands North in about five minutes, carries up to 10,000 passengers per hour per direction, and lets you clear both countries’ checks at the departure station. Fares have not been announced; Malaysia’s Transport Minister said they are expected by the end of 2026 (Malay Mail, 20 Oct 2026).

How do I continue into Singapore?

Woodlands North RTS station connects underground to Woodlands North station on the Thomson-East Coast Line (TEL), so you can continue by MRT from there.

Tip: Time your real route at your real hours for a week, as EdgeProp (13 Oct 2026) advises, and check ICA’s advisories before long weekends and festive periods.

If you would like to see units that make the most of this location, feel free to WhatsApp Darren.

Related guides

Sources

Frequently asked questions

How long is the RTS Link ride from Bukit Chagar?

About five minutes. According to the LTA, the line runs about 4 km from Bukit Chagar in JB to Woodlands North in Singapore, with no stops in between. Mothership (4 Oct 2026) reports trains about every 3.6 minutes at peak, from about 6am to midnight.

When will the RTS Link open?

Passenger service is targeted for February 2027, according to the LTA and Malaysia's Ministry of Transport (2 Oct 2026). This depends on the operator obtaining independent safety certification and final approvals. No exact opening day had been announced as of 9 November 2026.

Do I clear immigration twice on the RTS Link?

No. The RTS Link uses co-located customs, immigration and quarantine, so you clear both Malaysian and Singapore checks at the station where you board. You then arrive at the other end without a second set of checks, according to the LTA.

Darren

Johor Bahru property consultant focused on sales and rentals around Bukit Chagar, the CIQ and the RTS Link. This guide draws on public portal data, official announcements and our on-the-ground experience, and is reviewed regularly.

Keep reading

Don’t wait for the RTS to open to start looking

Tell us your budget and plan — own-stay, rental or both — and we’ll send the floor plans, the units available this week and an honest rental estimate. No spam, no pressure.

Message Darren on WhatsApp

Darren · Property consultant, Johor Bahru — Bukit Chagar, CIQ & RTS specialist

Get Floor Plans & Available Units